Component Engineering

BlowerManually load and unload Blower Housing Alignment Gage Machine for HVAV Blower Housing Assembly.

Components

  • Welded Steel Construction
  • Aluminum Base Plate and Nylon Holding Fixture
  • Custom Built Manually Operated Slide and Clamp for Secure Part
  • Two Pneumatic True Position Probes
  • Six Solartron Digital Transducers
  • Dell PC
  • ASI Datamyte Quantum Software for Data Acquisition

Sequence

  • Prior to operation the machine musto be mastered using Master Bushings provided
  • Load part
  • Clamp part (manually)
  • Extend True Position Probes (manual valve)
  • Press keyboard button to send variable data to PC
  • Quantum software uses variable data and complex mathematic equations and determines pass or fail
  • Quantum displays checked part print dimensions
  • Pass or fail parts are then unclamped
  • Unload part

gallery-blowerhousing